Our Projects
Sustaining capital works across WA mining, earthworks, dewatering, pipelines, pump stations and more. Filter by division or client to find the work closest to yours.
Showing 12 of 44 projects
All Projects

Solomon Airport Solar Hub: Clearing, Fencing and Bulk Earthworks
Clearing, fencing and bulk earthworks for the Solomon Airport Solar Hub.

B4 GNAM Pipeline Early Works
About 20 km of HDPE water pipeline from Brockman 4 to Greater Nammuldi, laid in a live mine.

Iron Bridge Tailings Scour Ponds 4 and 5
Two scour ponds and CSP culverts along the Iron Bridge tailings pipeline.

Mining Area C Communications Pads
Level pads for communications towers and equipment across Mining Area C's new LTE network.
Silvergrass East Abstraction Restart
Five new bore pumps and three pipelines to restart dewatering at Silvergrass East and Nammuldi.

West Angelas CEPS Surplus Water Storage
A disused pit turned into in-pit water storage, with discharge and extraction lines.

B4 Dewatering Installation and Commissioning
New abstraction bores at Brockman 4, piped in HDPE, wired and commissioned by our crews.

Batavia Coast Marina Stage 2
New roads, services and landscaping for the Stage 2 marina subdivision in Geraldton.

Bonney Downs Village: Pad Construction
Earthworks and pads for a permanent village housing Fortescue's wind turbine crews.

Brockman 2 Dewatering
Five abstraction bores at Brockman 2, supplied, installed and commissioned by our crews.

Cloudbreak Solar Farm: Civil Works
Clearing, bulk earthworks and civils for the 197 MWdc Cloudbreak solar farm and battery.

GNAM BSP Supply and Installation
Thirteen new dewatering bores at Greater Nammuldi, with pipework and buffer storage.

Hall Transfer Pond
A lined transfer pond and pump pad buffering dewatering flows at Christmas Creek.

KCGM Dam 3 Switchroom and Pump Station
Earthworks, switchroom and pump station for Dam 3 at KCGM, Kalgoorlie.

Pilbara Transmission Project: Earthworks
Access tracks, pole pads and substation pads along a 220 kV transmission line.
Albemarle Kemerton: Carpark and Civil Works
Perimeter fencing, laydown areas and the Eastern Carpark at the Kemerton lithium plant.

Broome North WWTP 80ML Storage Dam
A new 80 ML treated-water storage dam at Broome North.

Christmas Creek Hall Hub Civils
Final earthworks, drainage and car parks for the new Hall Hub.

Eliwana Eli10 Communications Pad
A communications pad and access track on Bluesky Ridge, plus a pad extension.

Flying Fish Radio Base Station Pad and Access Track
A radio base station pad and a 430 m sheeted access track at Flying Fish.

Flying Fish Village to Ren Bore Pipeline
A 2,050 m HDPE raw-water main and bore pump feeding the Flying Fish camp.

Hedland Junction Stage 4 Wedgefield
Roads and services for Stage 4 lots, extending Hematite Drive to Great Northern Highway.

Iron Bridge ROM B Sedimentation Basin
A new sedimentation basin catching stormwater at Iron Bridge, near Mundagoora Pool.

Kens Bore Culvert and Tunnel
A steel multi-plate arch tunnel and culverts for Onslow Iron at Ken's Bore.

Albemarle Kemerton: Internal Plant Roads
Plant roads, hardstands and drainage across the Kemerton lithium plant, in stages.

Albemarle Kemerton: Mechanical & Electrical Support
Mechanical, electrical and instrument hook-up across four plant areas, ready for commissioning.

Big Garden & Kangaroo Haul Road Culverts
CSP culverts and drainage under two haul roads at Cloudbreak.

Christmas Creek Hall Turkeys Nest
An earthen turkeys nest and pipeline feeding water carts across Hall, Cue and Bull.

Flying Fish Dewatering Realignment
About 3 km of DN630 bulk main realigned around the new Flying Fish haul road.

Kemerton Expansion Underground Services
Underground services for the Kemerton lithium plant expansion: buried fire water mains, electrical and fibre.

Queens North Bulk Main Realignment
A new HDPE bulk main around the north of Solomon mine, clear of new pits.

Solomon Trinity Pit Dewatering
Five abstraction bore pumps, pipelines and earthworks at the Trinity pit.

Brockman 4 Turkeys Nest Restoration
Four turkeys nests at Brockman 4 cleared of sediment and reeds and back to full capacity.

Coral Bay WWTP Evaporation Pond
A new evaporation pond and civil works at Coral Bay's wastewater plant.

Eliwana Dominion Haul Road Culverts
Culvert repairs and early works to keep an Eliwana haul road running.

Groote Eylandt Haul Road Arch Tunnel
A buried steel arch tunnel and haul road overpass across the Emerald River, Groote Eylandt.

Roy Hill ROM4 Drainage
Concrete barrier walls and drainage along road corridors at Roy Hill.

Solomon Stockyards 1A Pump Install and Tie-Ins
The Stockyards borefield re-equipped with new pumps and tie-ins for site supply.

Bigge Turkey Nest
An earthen water storage for dust suppression, with pipeline, pads and pump power.

Brockman 2 Fire and Service Water Upgrade
Four upgraded water networks at Brockman 2: process, potable and fire water, with new hydrants.

Far West Hub Conveyor Earthworks
About 10.4 km of detailed earthworks for a new overland conveyor at Cloudbreak.

Norfolk Abstraction Bores
New abstraction bores and pipework for the Norfolk South borefield at Cloudbreak.

Cocos Southern LV Ring Road
A 10 m light-vehicle ring road across three areas at Cloudbreak.

South Flank Culvert Installation
117 CSP barrels at 58 culvert crossings under haul roads, access roads and conveyor formations at South Flank.