Overland conveyor crossing a sealed haul road at Roy Hill, PilbaraAerial view of the lined turkey’s nest TCD built at Iron Bridge ROM B in the PilbaraThree white portable buildings with split-system air-conditioners, lined up in a sealed yardElevated switchroom beside the pump station manifold at KCGM, Kalgoorlie

Building the Infrastructure That Builds Western Australia

Civil, water, building and electrical, self-performed from trench to commissioning.

Our Divisions

Four divisions, one contractor: delivered in-house across Western Australia, from trench to commissioning.