Water
Pipe in the Ground, Water Where It’s Needed
Dewatering, bulk water mains and large-diameter pipeline works for WA mining: laid, joined, tested and commissioned by our own crews.
Selected Work

B4 GNAM Pipeline Early Works
About 20 km of HDPE water pipeline from Brockman 4 to Greater Nammuldi, laid in a live mine.
Silvergrass East Abstraction Restart
Five new bore pumps and three pipelines to restart dewatering at Silvergrass East and Nammuldi.

West Angelas CEPS Surplus Water Storage
A disused pit turned into in-pit water storage, with discharge and extraction lines.

B4 Dewatering Installation and Commissioning
New abstraction bores at Brockman 4, piped in HDPE, wired and commissioned by our crews.

Brockman 2 Dewatering
Five abstraction bores at Brockman 2, supplied, installed and commissioned by our crews.

GNAM BSP Supply and Installation
Thirteen new dewatering bores at Greater Nammuldi, with pipework and buffer storage.
What We Deliver
Dewatering Networks
HDPE and steel pipe networks, bore connections and tie-ins for in-pit and ex-pit dewatering.
Bulk Water Mains
Large-diameter HDPE and steel mains, valve assemblies and fittings for mine water supply and transfer.
Pipeline Modifications on Live Assets
Valve changeovers, spool modifications and tie-ins on operating pipelines, planned around client shutdowns.
Bores & Pump Connections
Production and abstraction bore headworks, pipework and connections, with power and controls from our electrical team.
Re-Injection & Water Management
Pipelines and bore connections for mine water re-injection and site water management.
Testing & Commissioning
Hydrostatic testing, flange management and commissioning, handed over ready to run.
Accreditations
- AS/NZS ISO 9001:2016 Quality
- AS/NZS ISO 45001:2018 Safety
- AS/NZS ISO 14001:2016 Environment
With Electrical