Details
Description
Fortescue’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the Flying Fish ore body. This included a new bore field, pipeline infrastructure, holding tanks and turkey’s nests.
TCD’s key deliverables included:
- 45km of HDPE pipelines for water supply of the mine, inclusive of 8km of buried pipelines
- 4 x Turkey’s Nests, each with a LV and HV Standpipe
- 1 x Transfer Pond and Pump Station
- 12 x Abstraction Bores
- 6 x Re-Injection Bores
Whilst on-site additional works were awarded for the pipe re-alignment for the Flying Fish Haul Road, as the current design clashed with the existing pipeline. Works included the installation and re-alignment of piping, valves and fittings.
Summary
$18M
Total Project Value
Client
FMG
Location
Elliwana Mine Site, WA
Project Duration
12 Months
Project Start
June 2022
Project Finish
June 2023