Albemarle Kemerton: Mechanical & Electrical Support

Start a Conversation
ClientAlbemarle
LocationSouth West
Year2020–23
DivisionElectrical

We provided mechanical, electrical and instrumentation (ME&I) support, including construction verification, for the Albemarle Kemerton plant: a greenfield lithium hydroxide production facility in the Kemerton Strategic Industrial Area.

Our ME&I scope covered installing mechanical, electrical and instrumentation equipment, terminations and testing, construction and design verification, and punch listing across the Pyromet, Hydromet, Utilities and Final Product processing areas. Our team played an integral role in bringing the plant to systems completion, ready for commissioning and handover to our client, and then provided ongoing commissioning support.

Our approach focused on working closely with multiple contractors and stakeholders to achieve and support successful plant commissioning.

Key Deliverables

  • Mechanical support works, including valve and piping installation, insulation and lagging, hydrostatic and pressure testing, structural rectification and motorised drive installation
  • Electrical and instrumentation infrastructure, including cable ladder, conduit and mechanical protection, MV, LV and ELV cabling, earthing systems, and equipment verification and testing
  • Lightning protection
  • High-voltage Wet Electrostatic Precipitator (WESP) electrode and transformer rectifier installation
  • Harmonic filter installation across the project's MCCs
  • Punch listing across all disciplines
  • Commissioning support, including FAT verification, SAT testing and interlock verification