Tag Archives: Electrical Infrastructure

Building Civil Construction Electrical Infrastructure Pipelines Site Buildings Read More Carrot icon
graphic graphic
Large industrial pipes mounted on steel support framework at Albemarle Kemerton lithium plant — TCD Group

Details

Description
Description

TCD provided comprehensive mechanical and electrical support services at Albemarle’s Kemerton lithium hydroxide processing facility. Our scope included installation of cable tray systems, electrical conduit infrastructure, and mechanical equipment foundations supporting the plant’s critical processing operations.

Working within an operational industrial environment, our team delivered precision installation of main distribution board infrastructure, underground cable routing, and process equipment supports while maintaining strict safety and quality standards required for lithium processing facilities.

Key Deliverables
  • Electrical cable tray and conduit installation
  • Main distribution board infrastructure
  • Underground cable routing and trenching
  • Mechanical equipment foundations
  • Process pipe supports and structures
Summary
Client
Albemarle Corporation
Location
Kemerton, WA
Project Duration
18 Months
Project Start
March 2022
Project Finish
August 2023

Gallery

Completed industrial building with landscaping at Albemarle Kemerton lithium plant — TCD Group construction
TCD Group construction team receiving safety award at Albemarle Kemerton project
Structural steel framework and scaffolding at Albemarle Kemerton lithium plant construction — TCD Group
Concrete structural framework with electrical conduit installation at Albemarle Kemerton — TCD Group
Solar panel tracking system assembly with dual motors at Albemarle Kemerton — TCD Group electrical support
Insulated HVAC ductwork and mechanical systems installation at Albemarle Kemerton — TCD Group
Industrial piping networks and mechanical systems inside Albemarle Kemerton processing facility — TCD Group
Worker installing conduit in excavated utility trench at Albemarle Kemerton construction site — TCD Group
Close icon
Featured Modal Image
Civil Construction Earthworks Electrical Infrastructure Roadworks Read More Carrot icon
graphic graphic
TCD project construction work in progress

Details

Description
Description

As part of Fortescue’s commitment to decarbonise its operations, new renewable green power electricity will be transmitted between sites using a dedicated 220KV overhead transmission network. TCD was contracted to undertake the major earthworks for access tracks, pads and substations to support this network between the Lamba Substation and Christmas Creek Mine.

Key Deliverables:
  • Vegetation clearing, grubbing, and stockpiling for 240 tracks and power pole pads over 120km
  • Construction of 2 new raised engineered embankment substation pads at Cloudbreak and Christmas Creek
  • Extensive borrow, cut and fill operations including grading, compaction, and final trim to design tolerances
  • Rail crossings, traffic management and operational integration measures

Works were delivered in close coordination with FMG stakeholders, minimising disruption to ongoing mine activities. Following successful completion, TCD was awarded a subsequent scope of comparable scale and complexity.

Summary
Client
FMG
Location
Pilbara, WA
Project Duration
12 Months
Project Start
January 2025
Project Finish
December 2025

Gallery

Earthworks for Pilbara Transmission Project power infrastructure
TCD project construction work in progress
TCD project construction work in progress
Earthworks for Pilbara Transmission Project power infrastructure
Close icon
Featured Modal Image
Civil Construction Culverts Earthworks Electrical Infrastructure Roadworks Solar Read More Carrot icon
graphic graphic
TCD project: Cloudbreak solar farm earthworks

Details

Description
Description

TCD was engaged to complete the bulk earthworks for the Cloudbreak Solar project, supporting the development of 197 MWdc of solar photovoltaic (PV) generation and large-scale battery storage.

Key Deliverables:
  • 350 hectares of clearing and grubbing
  • 125 hectares of final trimming works
  • Installation of 32 cable culverts
  • 25 kilometres of access tracks
  • 30,000 m³ of cut/fill
  • 13 kilometres of fencing

TCD actively coordinated with Fortescue to deliver the project on time, incorporating significant scope variations while managing interfaces with other contractors to ensure no delays onsite.

Summary
Client
Fortescue
Location
Cloudbreak, WA
Project Duration
5 Months
Project Start
April 2025
Project Finish
August 2025

Gallery

Bulk earthworks at Cloudbreak Solar Farm for FMG
Bulk earthworks at Cloudbreak Solar Farm for FMG
Bulk earthworks at Cloudbreak Solar Farm for FMG
Bulk earthworks at Cloudbreak Solar Farm for FMG
Close icon
Featured Modal Image
Civil Construction Communications Earthworks Electrical Infrastructure Roadworks Read More Carrot icon
graphic graphic
TCD project: Eliwana Eli10 communications pad

Details

Description
Description

TCD was engaged by Fortescue to deliver the construction of a communications pad at the Eliwana mine site. The project required mobilisation and haulage of material to a challenging elevated location.

Key Deliverables:
  • Clearing of vegetation and foundation compaction to establish a stable platform
  • Significant levelling works across the main pad and access track, addressing complex natural topography
  • Placement and compaction of approximately 8,000 m³ of material for pad and access road
  • Safe haulage of material through the active Eliwana mine with traffic management and coordination with FMG operations
  • Construction of rock chutes for effective drainage during heavy rainfall events

Delivered on time, safely, and to a high standard of quality despite challenging terrain and logistical demands.

Summary
Client
Fortescue
Location
Pilbara, WA
Project Duration
2 Months
Project Start
April 2025
Project Finish
May 2025

Gallery

Communications pad construction at Eliwana Eli10
Communications pad construction at Eliwana Eli10
Communications pad construction at Eliwana Eli10
Communications pad construction at Eliwana Eli10