Tag Archives: Mine Dewatering

Mine Dewatering Pipelines Pump Stations Water Management Read More Carrot icon
graphic graphic
Worker installing pipeline at KCGM Saline Dam

Details

Description
Description

TCD delivered a complete pump station and control infrastructure package for the Saline Dam 3 dewatering system at KCGM’s Super Pit operations in Kalgoorlie. The project integrated portable control buildings with high-capacity pump systems to manage saline water from mining operations.

Our team manufactured and installed custom portable control rooms, complete pump station infrastructure including manifolds and pipework, and integrated electrical and communications systems – delivering a turnkey solution for this critical water management facility.

Key Deliverables
  • Portable control room buildings – manufactured and installed
  • High-capacity pump station with multiple pump units
  • Stainless steel manifold and valve systems
  • Large-diameter pipeline infrastructure
  • Electrical and control system integration
  • Concrete foundations and civil works
Summary
Client
Northern Star Resources / KCGM
Location
Kalgoorlie, WA
Project Duration
6 Months
Project Start
October 2025
Project Finish
Ongoing

Gallery

KCGM pump manifold and pipework
KCGM pump station detail view of equipment
KCGM pump station overview showing complete installation
Crane installing building at KCGM site
KCGM control room interior
Close icon
Featured Modal Image
Civil Construction Earthworks Mine Dewatering Pipelines Water Bores Water Management Water Storage Read More Carrot icon
graphic graphic
TCD project: GNAM BSP dewatering infrastructure

Details

Description
Description

TCD was contracted for the supply, installation and commissioning of dewatering infrastructure as part of Rio Tinto’s GNAM BSP Abstraction Strategy.

Key Deliverables:
  • Install and commission 13 dewatering bores across LensAB, LensCD and LensEF
  • Construct temporary water storage (2× 1ML MEGAMAX tanks) and permanent storage (5ML Turkey’s Nest) at LensEF
  • Install pipelines, valves, fittings, supports and associated infrastructure
  • Install and commission 6× VSG dewatering trailer packages and 5× VSD headwork packages
  • Integrate all systems into SCADA/Wonderware
  • Earthworks, excavations, backfilling and surface restoration
  • Widen pipeline corridors and establish laydown areas
  • Decommission and remove redundant infrastructure
Summary

$4M

Total Project Value

Client
Rio Tinto
Location
Greater Nammuldi, WA
Project Duration
7 Months
Project Start
October 2025
Project Finish
April 2026

Gallery

Construction progress at GNAM BSP dewatering infrastructure site
Construction progress at GNAM BSP dewatering infrastructure site
Construction progress at GNAM BSP dewatering infrastructure site
Construction progress at GNAM BSP dewatering infrastructure site
Close icon
Featured Modal Image
Mine Dewatering Pipelines Water Bores Water Management Read More Carrot icon
graphic graphic
TCD project: GNAM dewatering 2023

Details

Description
Description

TCD was engaged to deliver essential infrastructure upgrades within the pit area, enabling Rio Tinto to meet below water table (BWT) mining requirements and maintain Saleable Ore Product (SOP) targets.

Key Deliverables:
  • All works conducted within the operational pit, adhering to strict safety, environmental and quality standards
  • Installed 5 dewatering abstraction bores within the pit, each equipped with flexible risers and VSG trailers
  • Commissioned Variable Speed Generator (VSG) trailer units and SCADA integration for real-time data acquisition and control
  • Installed pipe droppers to connect new bores to existing pipeline network
  • Polywelded and commissioned HDPE pipelines including tie-ins to existing infrastructure
Summary

$1M

Total Project Value

Client
Rio Tinto
Location
Pilbara, WA
Project Duration
3 Months
Project Start
May 2025
Project Finish
July 2025

Gallery

Mine dewatering works at GNAM 2023 project
Mine dewatering works at GNAM 2023 project
Mine dewatering works at GNAM 2023 project
Mine dewatering works at GNAM 2023 project
Close icon
Featured Modal Image
Mine Dewatering Pipelines Water Management

Flying Fish Dewatering

Read More Carrot icon
graphic graphic
TCD construction project image

Details

Description

Fortescue’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the Flying Fish ore body. This included a new bore field, pipeline infrastructure, holding tanks and turkey’s nests.

TCD’s key deliverables included:

  • 45km of HDPE pipelines for water supply of the mine, inclusive of 8km of buried pipelines
  • 4 x Turkey’s Nests, each with a LV and HV Standpipe
  • 1 x Transfer Pond and Pump Station
  • 12 x Abstraction Bores
  • 6 x Re-Injection Bores

Whilst on-site additional works were awarded for the pipe re-alignment for the Flying Fish Haul Road, as the current design clashed with the existing pipeline. Works included the installation and re-alignment of piping, valves and fittings.

 

Summary

$18M

Total Project Value

Client
FMG
Location
Elliwana Mine Site, WA
Project Duration
12 Months
Project Start
June 2022
Project Finish
June 2023

Gallery

TCD construction project image
TCD construction project image