Tag Archives: Building

Building Civil Construction Culverts Site Buildings Read More Carrot icon
graphic graphic
Insulated HVAC ductwork and mechanical systems installation at Albemarle Kemerton — TCD Group

Details

Description
Description

Expansion of carparking facilities and civil works at Albemarle’s Kemerton site, supporting the growing workforce at the lithium processing facility.

TCD delivered comprehensive civil works including carpark construction, drainage systems, and site improvements while coordinating with ongoing plant operations.

Key Deliverables
  • NPI carpark extension
  • Civil minor works packages
  • Drainage and stormwater management
  • Kerbing and line marking
  • Landscaping and site improvements
Summary
Client
Albemarle Corporation
Location
Kemerton, WA
Project Duration
6 Months
Project Start
July 2023
Project Finish
January 2024

Gallery

Concrete pump truck in action with workers on site — Albemarle project, Kemerton, Western Australia. TCD Group civil construction
Concrete truck pouring concrete for new curb/roadway — Albemarle project, Kemerton, Western Australia. TCD Group civil construction
Concrete pour for a new foundation — Albemarle project, Kemerton, Western Australia. TCD Group civil construction
Industrial piping networks and mechanical systems inside Albemarle Kemerton processing facility — TCD Group
Worker installing conduit in excavated utility trench at Albemarle Kemerton construction site — TCD Group
Concrete structural framework with electrical conduit installation at Albemarle Kemerton — TCD Group
Close icon
Featured Modal Image
Building Civil Construction Electrical Infrastructure Pipelines Site Buildings Read More Carrot icon
graphic graphic
Large industrial pipes mounted on steel support framework at Albemarle Kemerton lithium plant — TCD Group

Details

Description
Description

TCD provided comprehensive mechanical and electrical support services at Albemarle’s Kemerton lithium hydroxide processing facility. Our scope included installation of cable tray systems, electrical conduit infrastructure, and mechanical equipment foundations supporting the plant’s critical processing operations.

Working within an operational industrial environment, our team delivered precision installation of main distribution board infrastructure, underground cable routing, and process equipment supports while maintaining strict safety and quality standards required for lithium processing facilities.

Key Deliverables
  • Electrical cable tray and conduit installation
  • Main distribution board infrastructure
  • Underground cable routing and trenching
  • Mechanical equipment foundations
  • Process pipe supports and structures
Summary
Client
Albemarle Corporation
Location
Kemerton, WA
Project Duration
18 Months
Project Start
March 2022
Project Finish
August 2023

Gallery

Completed industrial building with landscaping at Albemarle Kemerton lithium plant — TCD Group construction
TCD Group construction team receiving safety award at Albemarle Kemerton project
Structural steel framework and scaffolding at Albemarle Kemerton lithium plant construction — TCD Group
Concrete structural framework with electrical conduit installation at Albemarle Kemerton — TCD Group
Solar panel tracking system assembly with dual motors at Albemarle Kemerton — TCD Group electrical support
Insulated HVAC ductwork and mechanical systems installation at Albemarle Kemerton — TCD Group
Industrial piping networks and mechanical systems inside Albemarle Kemerton processing facility — TCD Group
Worker installing conduit in excavated utility trench at Albemarle Kemerton construction site — TCD Group
Close icon
Featured Modal Image
Building Civil Construction Earthworks Mine Camps Pipelines Roadworks Water Management Read More Carrot icon
graphic graphic
TCD project: Bonney Downs village pad

Details

Description
Description

As part of Fortescue’s commitment to achieve real zero emissions by 2030 through renewable energy generation, TCD was contracted to construct a permanent base/camp supporting wind turbine operations, initially accommodating 350 people with future expansion capacity to 950.

Key Deliverables:
  • Vegetation clearing, grubbing and stockpiling for camp pad construction with 13,000 m³ cut to fill
  • Grading and repairing 2,000m of access tracks and pipeline corridors
  • Excavation, welding, pressure testing, installation and backfill of 750m of HDPE pipeline into a service trench
  • Clearing and grubbing of firebreak around camp pad
  • Construction of perimeter v-drains and windrows
  • Demolition of redundant concrete structures and tanks including controlled removal of hazardous waste
  • Clearing and topsoil grubbing for a new spray field

Delivered on time despite challenging scope changes, safely and to a high standard of quality.

Summary
Client
Fortescue
Location
Pilbara, WA
Project Duration
2 Months
Project Start
August 2025
Project Finish
September 2025

Gallery

Earthworks at Bonney Downs village pad construction
HDPE pipe coil ready for installation
HDPE pipe coil at project site
Creek drainage with rocks at construction site
Close icon
Featured Modal Image