Case Studies

Water Infrastructure Panel

After successfully completing a number of projects for FMG, TCD were pleased to be awarded the FMG Water Infrastructure Contract for a term of 2 years at the Christmas Creek, Cloudbreak, Solomon and Eliwana Mine Sites.

The Watering Infrastructure contract consists of installing water abstraction, bulk water transfer and water injection infrastructure and also water storage. Works include bulk HDPE pipelines from DN110 to DN630, installation of abstraction bores, installation of injection bore fields, construction of turkey nests, standpipes and connections, installation of pump stations, commissioning of all works, inclusive of testing the electrical and pipe works.

TCD continue to complete the work packages to a high standard, much to the satisfaction of a valued client.

$35.0M

Client

FMG

Location

FMG Mine Sites, WA

Project Duration

2 years

Project Start

July 2021

Project Finish

July 2023

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path