After successfully completing a number of projects for FMG, TCD were pleased to be awarded the FMG Water Infrastructure Contract for a term of 2 years at the Christmas Creek, Cloudbreak, Solomon and Eliwana Mine Sites.
The Watering Infrastructure contract consists of installing water abstraction, bulk water transfer and water injection infrastructure and also water storage. Works include bulk HDPE pipelines from DN110 to DN630, installation of abstraction bores, installation of injection bore fields, construction of turkey nests, standpipes and connections, installation of pump stations, commissioning of all works, inclusive of testing the electrical and pipe works.
TCD continue to complete the work packages to a high standard, much to the satisfaction of a valued client.