Case Studies

Village Road Box Culvert Upgrade

Designing and developing new methods is something that really motivates us at TCD. This is exactly what we did when we were engaged by the City of Karratha to refurbish Bridge 1585 on Village Road, in the Burrup Peninsula.

The works involved sleeving the existing concrete box culvert sections with higher rated, smaller dimensional units, grouting of the annulus, reinstatement of the wing walls, repairs to the apron slabs and minor earthworks to upstream and downstream aprons.

Where a straightforward approach could have done the job, our civil and workshop employees saw an opportunity create a more efficient process by developing a jacking and sliding system to assist with the installation of the box culverts.

$614K

Client

City of Karratha

Location

Karratha, WA

Project Duration

1 Month

Project Start

April 2019

Project Finish

May 2019

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.