Case Studies

Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Separation) Facility at their Christmas Creek Mine Site.

The scope of works included:

  • Construction of the WHIMS Building Pad, Concentrate Thickener Pad, belt Filter Pad, Screen Building Pad, two Switchroom Pads and crane pads.
  • Construction and modification of various access roads around the perimeter of the Vertical WHIMS Facility.
  • Construction and modification of various drainage systems, including the supply and installation of culverts and open drains.
  • Protection and relocation of existing services.
  • Blending of fill materials from three different source locations to meet the stringent fill material specification.
$2.8M

Client

FMG

Location

Pilbara, WA

Project Duration

3 months

Project Start

February 2020

Project Finish

April 2020

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us