Emergency Culvert Rectification Under Rio Tinto Rail

A collapsed corrugated steel culvert under Rio Tinto’s rail needed a quick and failsafe fix.

TCD and our Indigenous Partner, Yurra, pushed a new steel sleeve through the existing culvert from the short side of the collapsed area. We then excavated the excess material and jetted high pressure water through the culvert. With the steel pipe in place, our team capped and grouted each end of the culvert by hand, before grout filling the void with a pump.

With the emergency culvert fix completed, we then poured an in-situ headwall for the culvert. Some additional earthworks on the access track and two rail crossings ensured the operations were back in working order as fast as possible.

$400K

Client

Rio Tinto

Location

Karratha, WA

Project Duration

1 Month

Project Start

December 2017

Project Finish

January 2018

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us