RGP5 Chichester Deviation Rail Culverts

TCD were engaged by NRW Civil and Mining as part of the BHP Billiton RGP5 South Duplication – Chichester Deviation Project

TCD’s subcontract package included the supply and install of corrugated steel pipe culverts. It was a big undertaking with a total cumulative length of over 4 kms in culverts, ranging in size from 600mm to 3,600mm in diameter. They’ve been built to last with the supply and placement of cement stabilised backfill and the placing of rock protection at the culvert locations.

$3.3M

Client

NRW Civil and Mining

Location

Pilbara, WA

Project Duration

10 Months

Project Start

April 2010

Project Finish

February 2011

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us