Continuing our ongoing and successful relationship with NRW, we were awarded the drainage contract on Rio Tinto’s Gudai-Darri Mine Plant site and rail formation “south” package, including the Gudai-Darri Mine Access Road.
The total package included the installation of 8.7km of Polymer Coated Corrugated Steel Drainage Pipe ranging in size from 600mm diameter up to 1800mm diameter, including a 50 barrel 1650mm diameter culvert structure which was completed in just 14 days..