Continuing our ongoing and successful relationship with NRW, we were awarded the drainage contract on Rio Tinto’s Gudai-Darri Mine Plant site and rail formation “south” package, including the Gudai-Darri Mine Access Road.

The total package included the installation of 8.7km of Polymer Coated Corrugated Steel Drainage Pipe ranging in size from 600mm diameter up to 1800mm diameter, including a 50 barrel 1650mm diameter culvert structure which was completed in just 14 days..

$9.0M

Client

NRW Civil & Mining

Location

Gudai-Darri Mine Site, WA

Project Duration

2 years

Project Start

October 2019

Project Finish

September 2021

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us