Goman Creek Culvert Extension

With the introduction of the Autonomous Haul System (AHS) at FMG’s Cloudbreak Mine, the road trains delivering bulk fuel to the Norfolk and Kangaroo Mining areas needed a new route to eliminate any interaction with the AHS fleet.

The Goman Creek route was chosen but the vertical grades were too steep for the road trains to navigate. To make this route functional, TCD were engaged by FMG to extend the existing two-barrel DN3300 corrugated steel pipe culvert at the Cloudbreak Mine Site, and import 16,000ccm of material to lift the level of the road and ensure the vertical grade was suitable for road train usage.

The project was a success with travel times to the Norfolk and Kangaroo Mining Areas now greatly reduced, and no interaction with the AHS fleet.

$675K

Client

FMG

Location

Pilbara, WA

Project Duration

3 Months

Project Start

April 2019

Project Finish

June 2019

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us