Fire Water Piping Installation

TCD were engaged by Albemarle at the Kemerton Lithium Plant that is owned 60% by Albemarle through the MARBL Lithium Joint Venture for the supply, fabrication, installation and testing of piping, valves and ancillary associated items at their newly established plant site. The scope of works included:

  • Supply and installation of buried DN75 – DN315 HDPE and above ground Carbon Steel Pipe network.
  • Approximately 2.2km of trenching and backfill for buried pipework.
  • Installation of 79 fire hydrants.
  • Installation of 26 indicator posts onto existing fire water gate valves.
  • Installation of ancillary items such as concrete supports, thrust blocks, bollards, gate valves, pipe marking tape and labelling.
  • Hydrostatic pressure testing and service testing of the newly installed pipe network.
$

Client

Albemarle

Location

Kemerton Lithium Plant, WA

Project Duration

7 months

Project Start

November 2020

Project Finish

May 2021

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us