TCD were engaged by FMG for the Far Web Hub Project – Detailed Earthworks and the Supply and Construction of Culverts and a Tunnel.
The scope of works included:
- Tunnel: Supply and installation of 1 overpass tunnel, inclusive of the concrete tunnel footings, backfilling and compacting earthworks around the tunnel to the final overpass RL levels.
- Culverts: Supply and installation of 10 banks of CSP culverts and associated scour protection, inclusive of the cutting, forming and trimming drainage entry and exit channels, backfilling earthworks around the culverts and forming and finishing the earthworks to the final RL’s along the chainage.
- Detailed Earthworks: Complete detailed earthworks for the CV010 RLC along the full conveyor chainage (approximately 10.4km in length), including sheeting to finish the final RL levels. Works included the forming and finishing LV windrows for maintenance tracks along the entire length of the RLC and all and many other temporary miscellaneous civil and earthworks.
- Crusher Pad Foundation: Detailed earthworks for Hopper 010 primary crushing pad foundation, excavations for footings and construction pads, including foundation earthworks for Hopper 10’s discharge conveyor.