Case Studies

CV006 Earthworks, Roadworks and Drainage

TCD were engaged by FMG to undertake the earthworks, roadworks and drainage for the construction of the new CV006 Overland Conveyor at the Cloudbreak Mine Site.
The scope of works included:

  • CV006 overland conveyor detailed earthworks, from chainage 5023km to chainage 9543km.
  • Bulk earthworks at Norfolk ROM which included the construction of the base fill for Hopper 9 / CV009 and the Tail Slab of CV006.
  • Excavation works for foundation installation.
  • Supply and installation of corrugated steel pipe culverts.
  • Construction of drains.
  • Construction of Light Vehicle Access Roads.
  • Construction of temporary roads.
$4.75M

Client

FMG

Location

Pilbara, WA

Project Duration

6 months

Project Start

November 2019

Project Finish

April 2020

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope