The Coral Bay WWTP required upgrades to increase its disposal capacity due to a recent boost in tourism to the area and for future growth planning.

The scope of works included the construction of a new 200 x 80m Evaporation Pond 2 with BGM liner, access ramp and interconnecting box culverts, a new concrete spillway in Evaporation Pond 1 for emergency overflow, a new access ramp into the Emergency Infiltration Area, sand clean-out of Evaporation Pond 1 north east corner and repair of its GCL liner, construction of a new gravel hardstand as a Geobag Laydown area with PVC pipework to allow to control seepage back into the existing Facultative and/or Maturation Ponds and the widening and upgrade of the existing gravel access roads and turning areas at the facility.

$1.7M

Client

Water Corporation WA

Location

Coral Bay, WA

Project Duration

6 months

Project Start

May 2022

Project Finish

October 2022

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us