Cloudbreak Cocos FY23 Surface Water Management

TCD were pleased to be awarded the Cocos Surface Water Management package for FMG at their Cloudbreak Mine Site.  The project was split into two phases to accommodate other works on-site.

TCD’s key deliverables included:

  • Extension to 5 rail culvert banks, ranging from DN1200 to DN3300.
  • Bulk earthworks and Final Trim to raise the existing access road along Cocos West and East.
  • Construction of light vehicle windrows and windrow breaks.
  • Supply and installation of w-beam, guardrail at Cocos East.
  • Installation of a 15 barrel, DN1500 culvert, 72m in length on the Cocos Haul Road.
  • Installation of a 7 barrel, DN900 culvert, 60m in length on the Cocos Diversion.
  • Construction of heavy vehicle windrows on the Cocos Haul Road and the Cocos Diversion.
$5.7M

Client

FMG

Location

Cloudbreak Mine Site, WA

Project Duration

5 months

Project Start

October 2022

Project Finish

June 2023

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us